Accolent ERP supports four Costs for each product: Standard Cost, Alternate Cost, Special Cost and Average Cost. Average Cost is calculated internally by the system. For each of the other three Costs, Accolent ERP allows entry of a future cost together with the future date at which that future cost becomes operable. On a daily basis, the system checks the future dates entered and on the appropriate date updates future costs.

Accolent ERP Costs

  • Accolent ERP tracks four costs for each product: Standard, Alternate, Special and Average Cost.
  • Average Cost is calculated internally by the system and should not be changed by the user.
  • The three remaining Costs are typically used as follows:
    • Alternate Cost is the replacement cost of the product (i.e., Vendor’s price),
    • Standard Cost is the Alternate Cost plus an overhead markup that is typically used to make business decisions and for commission purposes, and
    • Special Cost is usually a non-replicable, one-off cost for the product.
  • Each of Standard, Alternate and Special Costs allow for the entry of future values and dates when these future costs are applicable.

Enter Future Costs

  • For Product 18JP1000V, on 7/12/24 enter Future Costs with Future Date of 7/14/24:
    • Future Standard Cost,

    • Future Alternate Cost, and

    • Future Special Cost.

Costs Updated

  • Costs to be updated by the system on 17/14/24:
    • New Standard Cost = $25.00

    • New Alternate Cost = $22.00

    • New Special Cost = $22.00

 

  • Was this Article Helpful ?
  • Yes   No
Tagged: